Paris District Road Report for April 17, 2023

Paris — Here’s a look at work planned in the district for the week starting April 17, 2023. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project.
The eastbound entrance ramp to US 82 at the US 75 intersection is closed to traffic. This ramp serves as the entrance ramp to eastbound US 82 at US 75. This closure is needed to complete the construction of the US 82 eastbound Frontage Road and new entrance ramp. Motorists are advised to use the eastbound frontage road and continue east through the Loy Lake intersection and use the eastbound entrance ramp from Loy Lake Road to gain access to US 82.
The eastbound US 82 exit ramp to US 75 is temporarily closed in order for crews to make the connection of the new exit ramp to US 82 and the frontage roads. Motorists traveling eastbound on US 82 are advised to use the FM 131 / Travis Street exit (Exit 641) and follow the eastbound frontage road to access US 75.
The northbound and southbound US 75 frontage road intersections with Center Street have been converted to an all-way stop. Traffic on the frontage roads is asked to pay attention to the advanced warning signs and new stop signs, and approach the intersection prepared for a stop there.
Lamar Street and Houston Street under US 75 are closed to through traffic with detour signs in place to guide motorists around these intersections.
Eastbound Lamar Street traffic will turn right on the southbound US 75 frontage road, turn left on Center Street, and turn left on the northbound US 75 frontage road to return to eastbound Lamar Street. Video animation of this detour can be seen at the following link.
https://youtu.be/5LrCpdOA8OQ
Westbound Houston Street traffic will turn right on the northbound US 75 frontage road, turn left on Washington Street, and turn left on the southbound US 75 frontage road to return to westbound Houston Street. Video animation of this detour can be seen at the following link.
https://youtu.be/7jCatnI3Oq4
These switches will allow crews to reconstruct the proposed US 75 mainlanes and the bridge over Lamar and Houston Streets. The US 75 northbound frontage road traffic is reduced to one travel lane, but two travel lanes remain for northbound US 75 mainlane traffic. A concrete barrier separates the northbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
https://youtu.be/y_uO0UmpCzk
For southbound US 75 the frontage road traffic is reduced to one travel lane, but two travel lanes remain for southbound US 75 mainlane traffic. A concrete barrier separates the southbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
https://youtu.be/k2EG2W9rFJY
US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between South Loy Lake Road and Lamberth Street as crews work on building new exit and entrance ramps. Watch for shoulder closures and lane shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews work on building new exit and entrance ramps. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on construction of new frontage road lanes.
FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project. The West Cypress Grove Road intersection on the east side of FM 1417 is closed to through traffic to allow crews to work on paving at the intersection. During the closure, traffic wishing to use Cypress Grove Road is asked to use Mimosa Drive and Redbud Trail as a detour route. Mainlane traffic has been switched to the new concrete section between Lamberth Street and SH 56. The intersection of Taylor Street on the west side of FM 1417 is closed to traffic in order for crews to complete the reconstruction of this intersection. During the closure, traffic wishing to use Taylor Street is asked to use Lamberth Street and Little Lane as a detour route. The Taylor Street closure is expected to last three weeks, weather permitting.
SH 11, Grayson County: from FM 697 in Sherman to US 69 in Whitewright. Work on the pavement overlay project has begun. Watch for daytime lane closures as workers mill and then overlay the roadway with a hot-mix surface. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
Park Road 20 in Eisenhower State Park, Grayson County. Watch for daytime lane closures within Eisenhower State Park as workers perform base repairs on the roadway and then overlay the roadway with a hot-mix surface. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
US 82, Grayson County: from the Cooke County line to FM 131 in Sherman. Watch for lane closures as workers replace the bridge railing and guardrail approaches at each bridge structure and install median barrier. During construction, the bridge location will be reduced to one lane while crews replace the bridge railing.
US 82, Grayson County: at the Old Southmayd Road intersection. Watch for daytime lane closures as workers lengthen the existing left turn lanes on US 82 at the Old Southmayd Road intersection and add right-turn lanes.
SH 56 (Main Street), Grayson County: in Whitesboro from Union Street to Collinsville Street. Watch for daytime lane closures on SH 56 as crews work on the rehabilitation project to remove and replace the sidewalks and parking areas along the square. During construction, the front entrances to the buildings will be temporarily closed and customers are asked to enter from the rear entrances. Occasional road closures will be required with a detour route in place to guide motorists around the project. The detour route will guide traffic along Union Street, Thode Street, and Collinsville Street to get around the project.
South Travis Street, Grayson County: in Sherman at Post Oak Creek. Construction is underway for the replacement of the South Travis Street bridge over Post Oak Creek. During construction, the bridge will be reduced to one lane with traffic signals controlling traffic through the project, while the new bridge is built in phases.
Business US 377B, Grayson County: south of Whitesboro at the railroad underpass near US 377. Watch for lane closures with signals controlling traffic while crews work to upgrade the bridge railing.
US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Friday morning during the overnight period. Lane closures will be present at night for crews to replace failed concrete sections. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.
FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121. Construction is ongoing on this new-location roadway which is west of SH 289 approximately four miles. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections, with flaggers present to control traffic. Work on FM 121 at the FS 121 intersection (formerly Scharff Road intersection) is ongoing as crews work to widen the pavement to add turn lanes. Motorists on FM 121 should expect lane shifts while crews widen the pavement and install a culvert.
US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Monday and Thursday during the nighttime.
FM 121, Grayson County: from US 377 to SH 289. Watch for daytime lane closures as maintenance crews blade level the roadway with hot-mix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 2729, Grayson County: from FM 697 to SH 11. Watch for daytime lane closures as crews perform edge repairs to the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 902, Grayson County: at the Wall Street intersection. Watch for daytime lane closures as crews perform base repairs and pavement leveling. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 1417, Grayson County: at the SH 11 intersection. Watch for daytime lane closures as crews perform base repairs and pavement leveling. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 100, Fannin County: from SH 56 to FM 2216. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway. Motorists should expect delays as signals and pilot cars direct traffic through the work zone.
SH 78, Fannin County: at the Bois d’Arc creek bridge south of FM 1629. Watch for daytime lane closures as crews perform bridge maintenance work on the bridge. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
CR 1320, Fannin County: at the Caney Creek Bridge is closed to traffic in order for crews to replace the bridge structure and approaches.
FM 271, Fannin County: from SH 78 to FM 68. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway. Motorists should expect delays as signals and pilot cars direct traffic through the work zone.
SH 78, Fannin County: from FM 273 to Oklahoma State line. Watch for daytime lane closures as crews perform base repairs on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
SH 34, Fannin County: from FM 64 to FM 1550. Watch for traffic shifts and traffic signal-controlled lane closures as workers build the bridge approaches for the new SH 34 roadway at the future Lake Ralph Hall.
FM 1550, Fannin County: from SH 34 to CR 3544. Watch for daytime lane closures as crews work on building the connection of the realigned FM 1550 to the existing roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.
US 69, Fannin County: from the Grayson County line to the Hunt County line. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

Sulphur Springs Area (Hopkins, Franklin Counties):
Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.
I-30, Hopkins County: from Hunt County Line to Franklin County Line. Watch for lane closures and short delays as crews perform concrete pavement repair.
I-30, Franklin County: 3 Miles West of SH 37. Crews will be clearing trees in the area for truck parking construction.

Paris Area (Delta, Lamar, Red River Counties)
Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.
SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane and shoulder closures while crews resurface the roadway and perform bridge maintenance.
FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.
FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.
Loop 286, Lamar County: from FM 1497 around the north loop to FM 1507. Watch for temporary lane and shoulder closures and traffic merges while crews improve guardrail and drainage structures, perform bridge maintenance and place bonded concrete surfacing.
Loop 286 / US 271 South Interchange, Lamar County: from Dawn Drive going south to the North Loop 286 turn around. Watch for temporary lane and shoulder closures, lane shifts, and traffic merges while crews improve guardrail and perform bridge maintenance.
Loop 286 at BU 271 (Clarksville Street), Lamar County: Exit ramp from southbound Loop 286 onto BU 271. Watch for temporary exit ramp closure while crews make repairs to adjacent metal beam guard fence.
FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
BU 271 (North Main Street), Lamar County: from Santa Fe Street to one-quarter mile north of Stone Avenue. Watch for temporary lane closures while crews install sidewalk
US 82, Lamar County: at the FM 1502 intersection. Watch for temporary lane closures, and traffic and lane shifts as crews widen the roadway to install a left-turn lane and improve drainage structures.

Cedar / Church Street (Clarksville, Texas), Red River County: at the intersection of Cedar and Church Street in Clarksville, Texas. Watch for road closure while crews remove and replace the existing bridge.

Greenville Area (Hunt, Rains Counties)
Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

SP 302: Hunt County (From SH 34 to FM 499, from 499 to I-30, from US 69 to SH 34, from O’Neal Street to US 69). The contractor has begun setting work zone signs and barricades. Milling and paving operations have begun on Business 69 from Joe Ramsey to I-30 Frontage Road. Please be aware of workers and watch for work zones when traveling in this area.
FM 2649, Hunt County (From I-30 to FM 1567): Contractors have set barricades and work zone traffic signs. The contractor has begun placing driveway safety ends and concrete pipe. Cross culvert work and prep right of way and the reworking of the roadway and subgrade widening has begun. Please be aware of workers and watch for work zones when traveling in this area.
CR 1032, 1031 and 2132 bridge replacement project, Hunt County. The contractor has set barricades and advance warning signs. The contractor has reopened the CR 1032 and CR 2132 bridge. The contractor has begun work on CR 1031 by performing prep right of way work and placing detour. Please be aware of workers and watch for work zones when traveling in this area.
SH 224, Hunt County: The contractor has placed final hot mix, poured the mow strip and installed metal beam guard fence. All structural work is completed. The contractor plans to seed vegetation and perform minor cleanup at this location. The contractor has removed barricades and opened the bridge to traffic. Please be aware of this construction, the detour route and workers in the area.
FM 275, Rains County: from SH 19 to FM 514. The contractor has completed installing small signs and mailboxes and project cleanup and punch list items are underway. Please be aware of workers and watch for work zones when traveling in this area.
SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor was able to open west and east bound lanes of the SH 276 Bypass. The contractor plans to begin removal of parts of old Business 276. Interim striping and sign placement will begin on SH 276. Flex base work will begin on the tie-ins of the bypass and Business SH 276. Please be aware of lane closures and changes to current traffic configuration and watch for work zones and workers when traveling in this area.
SH 66, Hunt County: SH 66 at FM 1570, SH 34 at FM 1570. The contractor has installed signal poles and signal lights at SH 34 and FM 1570 and SH 66 intersections. Some sodding work will begin soon. Stop-bar striping was added at SH 34 and FM 1903.
Maintenance crews for both Hunt and Rains County will be performing various sign and mailbox installations on various roads. Rains County crews will be working seal prep patching on FM 2101 and various bridge and culvert maintenance projects throughout the county. Hunt crews are addressing potholes on SH 34 and performing overlay operations on FM 1564. Both crews are addressing potholes and roadway complaints. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

#