Paris District Road Report for May 16, 2022

Paris — Here’s a look at work planned in the district for the week starting May 16, 2022. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. The northbound Washington Street exit ramp is currently closed and exiting traffic is requested to use the Houston/Lamar Street exit ramp. The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Lamar/Houston Street exit. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project. 

The reopening of the mainlanes and underpass at the Center Street area to traffic is underway. Northbound and southbound mainlane traffic have been moved to the newly constructed mainlanes. The Center Street intersection under US 75 is scheduled to be reopened to traffic the week of May 18. 

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road from just north of Houston Street and transitions back to the existing main lanes south of North Travis Street. This operation will allow for reconstruction of the proposed US 75 main lanes and the bridge over Washington Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Washington Street under US 75 are closed to traffic. This closure is necessary to complete work in preparation of the mainlane detour. To detour, eastbound Washington Street traffic will turn right on the southbound US 75 frontage road, turn left on Lamar Street, and turn left on the northbound US 75 frontage road to return to Washington Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on North Travis Street, and turn left on the southbound US 75 frontage road to return to Washington Street.

Video animations of the northbound US 75 mainlane traffic switch and Washington Street detour can be viewed online at:

  • Northbound US 75 mainlane traffic switch:
  • Southbound US 75 mainlane traffic switch:
  • Detour for the Washington Street closure at US 75:

US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between North Loy Lake Road and Lamberth Street as crews work on building new exit and entrance ramps. Watch for shoulder closures and lanes shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews work on building new exit and entrance ramps. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on construction of new frontage road lanes.

US 82, Grayson County: from SH 91 to the Fannin County line. Watch for daytime lane closures as crews perform spot pavement repairs.

FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project. The Canyon Creek intersection on the east side of FM 1417 will be closed to traffic beginning May 9 to allow crews to complete the concrete paving at this intersection. The intersection is expected to be closed for around three weeks to complete the work. Travelers are asked to use Lamberth Street during this closure.

SH 5, Grayson County: in Van Alstyne along Newport Drive from Partin Elementary School to SH 5, and along SH 5 from Newport Drive to Forrest Moore Park. Construction on a new multi-use trail is underway. The project will install an eight-foot-wide minimum sidewalk trail along this stretch of roadway. During work on this project, occasional lane closures will be required to complete the work.  

FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for occasional daytime lane closures as crews work to complete the remaining work on the project.  

US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Thursday night. Lane closures will be present at night for crews to replace failed concrete. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.

FM 1753, Grayson County: from FM 120 to FM 1897. Watch for daytime lane closures as crews work to rehabilitate and then overlay the roadway.

FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121.  Construction is ongoing on this new-location roadway which is west of SH 289 approximately four miles. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections, with flaggers present to control traffic.

FM 121, Grayson County: in Van Alstyne from Preston Avenue to John Douglas Road. Watch for occasional daytime lane closures and shoulder closures as construction crews work to install sidewalks, curb ramps, and landscape features.

US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.

US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Sunday, Tuesday, and Thursday during the nighttime.

The annual contract to perform bridge repairs in Grayson County is underway. The following locations will have bridge repairs performed, so travelers should expect occasional lane closures while this work is underway. US 75 northbound mainlane bridge at Iron Ore Creek, US 75 southbound frontage road bridge at Iron Ore Creek, the SH 289 bridge approximately 1.75 miles south of FM 120, and FM 1417 at Post Oak Creek.

FM 1897, Grayson County, from US 69 to FM 1753. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 898, Grayson County, from SH 11/US 69 to the Fannin County line. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 697, Grayson County, from SH 11 to FM 2729. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 121, Grayson County, at the Wall Street intersection.  Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for occasional daytime lane closures as workers complete the remaining work on the project.

CR 3810 at Loring Creek, Fannin County. The bridge on CR 3810 at Loring Creek is closed to through traffic in order to replace the bridge. During this closure traffic is asked to use CR 3800.

SH 34, Fannin County: from FM 64 to FM 1550. Watch for occasional daytime lane closures as workers build the new SH 34 bridge over the future Lake Ralph Hall.

FM 1552, Fannin County: from SH 78 to County Road 3710. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 1550, Fannin County: from County Road 3330 to SH 34. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow-moving construction equipment as crews work on re-establishing vegetation on the project. Watch for occasional daytime lane closures as crews complete the remaining work.

FM 1396, Fannin County: from FM 897 west to FM 2029. Watch for daytime lane closures as crews work to widen the roadway.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 37, Franklin County: from the elementary school to US 67. Watch for lane closures and short traffic delays as crews install sidewalk.

IH 30, Hopkins County: from Loop 301 to Franklin County Line. Watch for lane closures and traffic delays as crews begin surfacing operations.

FM 1536, Hopkins County: from SH 19 to FM 71. Watch for lane closures and short delays as crews begin upgrading cross drainage structures.

FM 3389, Hopkins County: from IH 30 to FM 1567. Watch for lanes closures and short delays as crews perform surfacing operations.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane closures while crews resurface the roadway.

US 271, Red River County: from SH 37 to Titus County Line. Watch for temporary lane closures while crews resurface the roadway. 

FM 906, Lamar County: from FM 2648 to CR 47400. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.

FM 195, Red River County: from the Lamar County line to SH 37. Watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail. 

FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

US 82, Red River County: from FM 1159 to the Bowie County line. Watch for work zones and drive safely through construction areas while final work is being performed.

Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures.

FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

CR 3440, Delta County: at Jennings Creek. Watch for road closure while crews replace the existing bridge.

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

Sidewalk and Curb Ramp Project (several counties): The contractor has set barricades at the Wolfe City, Texas, location. The contractor is currently working on Santa Fe Street and FM 816 and is nearing completion in this area. The project is wrapping up in the downtown area of Wolfe City. The contractor has been working on forming and pouring concrete on sidewalks and driveways, weather permitting. This project will improve pedestrian sidewalks and construct ADA-compliant curb ramps at these locations: Hunt County, SH 34 at Crockett Street to SH 34 at FM 816 in Wolfe City. Please be aware of workers and watch for work zones when traveling in this area.

FM 903, Hunt County: From US 380 to FM 1569 South. The contractor has set barricades and bulletin boards and advance warning signs. The contractor has finished ditches, base for the prime coat, performed a ride test, prime coated, and temporary striped mile one. The contractor is reworking base, placing geogrid, and hauling flex base on mile two. The contractor has finished pouring the cross structures. The contractor will be pouring concrete driveways, working on driveway pipe and safety end treatments.

FM 275, Rains County: from SH 19 to FM 514. The contractor has completed widening and reworking existing base for the last section of the project. The contractor has finished flex base hauling and placing in the last section. The contractor has begun cement treatment on the last section of the project. The contractor has completed the 150-foot bridge deck pour. The contractor continues setting safety end treatments and driveway pipe on the south side of the project. Please be aware of lane closures, detours, and watch for work zones and workers when traveling in this area.

SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor has placed project barricades and has prepared and cleared the right-of-way. The contractor has performed a traffic switch for northbound and southbound traffic on Spur 264 to complete the concrete pavement on the east half of Spur 264. The contractor continues grading flex base on SH 276 from east of the bridge approach to the proposed CRCP section, fine grade embankment work on the west end of the project, and prep work for geo-grid and flex base. The contractor started the CRCP section on the east side of the bridge approach. Please be aware of lane closures and watch for work zones and workers when traveling in this area.

FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor has placed prime coat on the beginning mile. The contractor has placed temporary stripe on the first mile. The contractor has finished mailbox turnouts. The contractor is working on the proposed signing for the project. Seal coat for pavement surface will begin soon, weather permitting.

Maintenance crews in Hunt County will be performing overlay operations on FM 2655 to SH 11 in Wolfe City. Crews will be performing potholing at various locations in Hunt County. Maintenance crews will be installing mailboxes, delineators, and signs in various locations.  Maintenance crews will be performing herbicide operations at various locations. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

Maintenance crews in Rains County will be performing seal coat prep work on FM 1903 from SH 34 to the I-30 frontage road. Crews will be performing sign installations, mailbox installation, potholing, and debris removal. Maintenance crews will be performing herbicide operations on various roadways. Please watch for lane closures, work zones and workers along the roadway, and maintain a safe distance from work crews.

###

new TXDOT EndTheStreakTX logo