Paris — Here’s a look at work planned in the district during the week of Dec. 6, 2021. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121.  Construction is expected to begin Nov. 29 on this new-location roadway. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections with flaggers present to control traffic.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. The northbound Washington Street exit ramp is currently closed and exiting traffic is requested to use the Houston/Lamar Street exit ramp. The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Lamar/Houston Street exit. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project. 

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road near West Staples Street and transitions back to the existing mainlanes near West Cherry Street. This operation will allow for reconstruction of the proposed US 75 mainlanes and the bridge over Center Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Center Street under US 75 are closed to traffic. To detour, eastbound Center Street traffic will turn right on the southbound US 75 frontage road, turn left on Park Avenue, and turn left on the northbound US 75 frontage road to return to Center Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on Houston Street, and turn left on the southbound US 75 frontage road to return to Center Street.

Video animations of the northbound US 75 mainlane traffic switch and Center Street detour can be viewed online at:

  • Southbound US 75 mainlane traffic switch:

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road from just north of Houston Street and transitions back to the existing main lanes south of North Travis Street. This operation will allow for reconstruction of the proposed US 75 main lanes and the bridge over Washington Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Washington Street under US 75 are closed to traffic. This closure is necessary to complete work in preparation of the mainlane detour. To detour, eastbound Washington Street traffic will turn right on the southbound US 75 frontage road, turn left on Lamar Street, and turn left on the northbound US 75 frontage road to return to Washington Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on North Travis Street, and turn left on the southbound US 75 frontage road to return to Washington Street.

Video animations of the northbound US 75 mainlane traffic switch and Washington Street detour can be viewed online at:

  • Northbound US 75 mainlane traffic switch:
  • Southbound US 75 mainlane traffic switch:
  • Detour for the Washington Street closure at US 75:

US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between North Loy Lake Road and Lamberth Street as crews work on building new exit ramps. Watch for shoulder closures and lanes shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews perform bridge construction. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on bridge construction and construction of new frontage road lanes.

The westbound US 82 exit ramp for Loy Lake road is currently closed for crews to work on widening the US 82 frontage road. Traffic wishing to access Loy Lake Road is requested to take the SH 91 exit ramp (# 643), or the US 75 exit ramp.

FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project.

FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for occasional daytime lane closures as crews work to build portions of the new bridges and roadway. Watch for lane shifts and narrow lanes throughout the project as crews have moved traffic to a portion of the new concrete pavement. The ultimate roadway will be a five-lane section consisting of concrete pavement when the project is completed.  

US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.

US 377, Grayson County: from US 82 to FM 901. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Sunday and Wednesday during the nighttime.

FM 898, Grayson County: in Whitewright from US 69 to the Fannin County line. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 996, Grayson County: in Pottsboro from FM 120 to FM 1417. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 1417, Grayson County: from FM 691 to FM 120. Watch for daytime lane closures as maintenance crews perform base repairs on the roadway.

FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 34, Fannin County: from FM 64 to FM 1550. Watch for occasional daytime lane closures as workers build the new SH 34 bridge over the future Lake Ralph Hall.

FM 1552, Fannin County: from SH 78 to County Road 3710. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 1550, Fannin County: from County Road 3330 to SH 34. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow-moving construction equipment as crews work on widening US 82 from a two-lane roadway to a four-lane divided roadway. Westbound US 82 traffic has been shifted to the new pavement for the entirety of the project from the Lamar County line to SH 121. Eastbound traffic between SH 121 and the Lamar County line has been opened to two lanes. Watch for occasional daytime lane closures as crews complete the remaining work.

FM 68, Fannin County: from SH 78 to SH 34. Watch for daytime lane closures as maintenance crews blade level the roadway.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 37, Franklin County: from the elementary school to US 67. Watch for lane closures and short traffic delays as crews install sidewalk.

IH 30, Hopkins County: from Hunt County Line to Franklin County Line. Watch for lane closures and short traffic delays as crews perform concrete repair.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane closures while crews resurface the roadway.

US 271, Red River County: from SH 37 to Titus County Line. Watch for temporary lane closures while crews resurface the roadway. 

FM 906, Lamar County: from FM 2648 to CR 47400. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.

FM 195, Red River County: from the Lamar County line to SH 37. Watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail. 

FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

US 82, Red River County: from FM 1159 to the Bowie County line. Watch for work zones and drive safely through construction areas as final work is being performed.

Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures.

FM 79, Lamar County: from 0.6 miles Northeast of State Loop 286 to 0.8 miles Northeast of State Loop 286. Watch for temporary lane and shoulder closures while crews complete cross structure work.

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

Sidewalk and Curb Ramp Project (several counties): The contractor has set barricades at the Wolfe City, Texas, location. This project will improve pedestrian sidewalks and construct ADA-compliant curb ramps at these locations: Hunt County, SH 34 at Crockett Street to SH 34 at FM 816 in Wolfe City. Please be aware of workers and watch for work zones when traveling in this area.

FM 275, Rains County: from SH 19 to FM 514. The contractor has set barricades and plans to begin preparing the right-of-way soon. The contractor has reworked base material and widened subgrade from Lake Fork Creek to the north for one mile, graded out and prepared for new flex base, and began hauling base material on Nov. 19. The contractor has demolished the bridge and will continue placing flex base on the first mile. Cleanup operations in preparation for installation of drilled shafts will begin shortly. Please be aware of lane closures, detours, and watch for work zones and workers when traveling in this area.

SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor has placed project barricades and has prepared and cleared the right-of-way. Preliminary embankment, excavation, and bridge work has begun with all shafts being completed. This work should not affect existing traffic on SH 34 or SH 276. Roadway construction affecting closures on Spur 264 has begun, this work will affect through-traffic between Meyers Avenue to County Road 2304. Weekend work is to be expected. Please be aware of lane closures and watch for work zones and workers when traveling in this area.

FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor is completing mile six of this seven-mile project and is currently reworking the subgrade and bringing in flex base, placing geogrid and compacting areas for roadway rehabilitation and widening. Please be aware of lane closures and watch for work zones and workers when traveling in this area.

Maintenance crews in Hunt County will be performing seal coat preparation on FM 512 north of I-30 at various locations and overlaying on FM 499 at various locations. Crews will be performing potholing at various locations in Hunt County. Maintenance contract crews will be performing debris removal on I-30 and guard rail repair at various locations around Hunt County. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

Maintenance crews in Rains County will be performing seal coat prep work on SH 34 from SH 276 to the Kaufman County line. Crews will be performing various sign installations, potholing, edging, and debris removal. Maintenance crews will be performing herbicide operations on various roadways. Please watch for lane closures, work zones and workers along the roadway, and maintain a safe distance from work crews.

###