Alliance Bank in Sulphur Springs

Paris District Road Report for the Week of November 16, 2020

Paris — Here’s a look at work planned in the district during the week of Nov. 16, 2020. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

The annual contract to perform crack sealing operations in Grayson County begins November 23rd.  Daytime lane closures will be present during crack sealing operations and drivers should expect delays. The following roadways in Grayson County will be crack sealed this year; Business US 377D in Tioga, Business US 377C in Collinsville, SH 289 from the Collin County line to US 82, FM 996 from FM 120 to FM 1417, SH 91 from US 75 to FM 1310, the US 82 frontage road in Sherman, FM 120 from FM 1753 to the Oklahoma State line, FM 1897 from US 69 to the end of State maintenance, FM 898 from SH 11 to the Fannin County line, FM 121 from FM 3356 to SH 289, FM 120 in Pottsboro from Chrissa Drive to Vine Street, and the US 75 frontage roads from FM 902 to the Collin County line.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on northbound and southbound US 75 between Center Street and FM 1417 as crews work on building new main lanes and the new South Travis Street Bridge. Watch for lane closures on the frontage roads between FM 1417 and SH 91 as crews work on building detours and installing drainage structures. The northbound exit ramp for Houston and Lamar Streets (SH 56) is currently closed, and exiting traffic is requested to use the Park Avenue exit ramp. The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Houston/Lamar Street (SH 56) exit. The northbound frontage road from South Travis Street to near Park Avenue is closed for crews to work on building the remaining portion of the retaining wall along US 75 at the South Travis Street intersection. Traffic is requested to use the US 75 mainlanes during this closure. The southbound Washington Street exit ramp is currently closed, and exiting traffic is requested to use the North Travis Street exit. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project. 

The US 75 pedestrian bridge near Pecan Street in Sherman is closed to pedestrian traffic. The east side over the frontage road has been removed. The remaining pedestrian bridge will be removed at a later time. Pedestrians wishing to cross US 75 are advised to cross at the Houston Street signalized intersection. 

US 75 Full Depth concrete repair, Grayson County: Crews will be working on US 75, weather permitting, each week from Sunday night through Thursday night. Lane closures will be present during the nighttime only in order for crews to replace failed concrete slabs. Lane closures begin at 7:30 p.m. and should be reopened to traffic by 6 a.m.

FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct a portion of the new Sand Creek bridge and the approaches to the bridge. Watch for occasional daytime lane closures as crews perform utility work. A reduced speed limit of 45 mph has been set for this construction project.

FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for occasional daytime lane closures as crews work to build portions of the new bridges and roadway. Watch for lane shifts and narrow lanes throughout the project as crews have moved traffic to the temporary detour section. The ultimate roadway will be a five-lane section consisting of concrete pavement when the project is completed.  

US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.

US 75 Ramp Reversal in Denison, Grayson County: on the southbound US 75 main lanes and frontage road between Spur 503 and FM 691. Watch for occasional daytime lane closures on the southbound US 75 frontage road while construction crews work on completing the remainder of the project. A new traffic pattern has been implemented where westbound Spur 503 will be shifted to the southbound US 75 frontage road and will travel through the FM 691 intersection and then enter southbound US 75 using the on-ramp after FM 691. The new FM 691 exit ramp is open to access FM 691. 

US 377, Grayson County: from US 82 to FM 901. Watch for temporary daytime lane closures and shoulder closures as workers install safety treatments on fixed objects.

US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Monday, Wednesday, and Friday during the daytime.

US 82 & US 69, Grayson County: from FM 131 to FM 1897 on US 82, and from SH 56 to US 75 on US 69. Watch for temporary daytime lane closures and shoulder closures as workers install safety treatments on fixed objects.

FM 121, Grayson County: from SH 289 to FM 3356.  Watch for daytime lanes closures as maintenance crews blade level the roadway.  

FM 131, Grayson County: between FM 120 and US 82. Watch for daytime lanes closures as maintenance crews blade level the roadway.

FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for temporary one-lane closures as workers rehab and widen the roadway.

The annual contract to perform crack sealing operations in Fannin County begins November 23rd.  Daytime lane closures will be present during the crack sealing operations and drivers should expect delays. The following roadways in Fannin County will be crack sealed this year;  FM 1396 from SH 78 to  FM 2029, FM 1752 from US 82 to FM 1753, US 82 from SH 121 to the Grayson County line, SH 11 from SH 121 to SH 78, SH 78 from SH 11 to US 69, and FM 68 from SH 78 to SH 34.

FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 2815, Fannin County: from FM 1629 to SH 11. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 1743, Fannin County: from SH 56 to FM 1550. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install safety treatments on fixed objects.

US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow moving construction equipment as crews work on widening US 82 from a two-lane roadway to a four-lane divided section. Westbound US 82 traffic has been shifted to the new pavement on the eastern end of the project between the Fannin and Lamar County line and County Road 2975. Eastbound traffic will remain in its current lane, while crews work on the inside lane to work on building the crossovers and turn lanes. Drivers who frequent this roadway are advised that all driveways, county roads and farm-to-market roads approaching the new westbound main lanes on US 82 will have a full stop before crossing over to the median. The SH 121 and US 82 frontage road intersections have been converted to signalized intersections. The on-ramp to westbound US 82 from SH 78 has been closed while crews work on building the new westbound main lanes. The westbound exit ramp for SH 121 is closed as crews work on building the new main lanes in this area. Exiting traffic for SH 121 is asked to use the SH 78 exit and continue along the frontage road to SH 121.  

County Road 3530, Fannin County: at Wafer Creek. County Road 3530 is closed for crews to remove the existing bridge and build a new culvert. Traffic on CR 3530 will need to use an alternate route during construction.

County Road 4250, Fannin County: at Freeman Creek. County Road 4250 has been reopened to traffic as crews have completed building a new bridge. 

FM 274, Fannin County: from SH 78 to FM 1753: Watch for daytime lane closures as crews blade level the roadway.

SH 78, Fannin County: from FM 981 to the Collin County line. Watch for daytime lane closures as crews perform ditch cleaning work.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 19, Hopkins County: From Loop 301 to Delta County Line. Watch for crews performing work on cross drainage structures.

I-30, Hopkins & Franklin Counties: From Titus County Line to Hunt County Line. Watch for lane closures and short traffic delays as crews upgrade metal beam guard fence.

FM 3389, Hopkins County: From IH 30 to FM 1567. Watch for lane closures and short traffic delays as crews begin work on cross drainage structures.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

NW Loop 286 at FM 79, Lamar County: The right lane will be closed while crews perform slope repair work along the southwest exit ramp.  

FM 79, Lamar County: from Loop 286 to BU 82 H (Bonham Street). Watch for lane closures while crews install drainage inlet and place final pavement markings.

FM 1507, Lamar County: from South Collegiate Drive to Loop 286. This roadway is closed while crews rehabilitate and resurface the existing roadway.

Lamar County: Watch for temporary lane closures while crews perform crack sealing on various roadways; FM 2648, FM 3298, FM 2820, FM 2122, US 271, BU 82, FM 137, SH 19, BU 271, and FM 3426.

SH 19, Delta County: from the Delta-Lamar County line to SH 24/19 south. Watch for lane closures while crews perform full-depth concrete repairs.

FM 1487, Red River County: from FM 909 to FM 910.  Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

FM 911, Red River County: from BU 82K (Avery) to FM 44. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

SH 37, Red River County: from US 271 (Bogata) to Franklin County Line. Watch for daytime lane closures as crews mill existing pavement, upgrade bridge rail, and place new hot mix.

BU 271D, Red River County: from US 271 to SP 38 (Bogata). Watch for daytime lane closures while crews rehabilitate the existing roadway.

US 82, Red River County: from FM 1159 to Bowie County Line. Traffic is shifted to the north side of the roadway between FM 44 and FM 1699 while crews perform pavement widening work on the south side.  

SH 37, Red River County: from the Texas-Oklahoma state line south to the Red River-Franklin County line. Watch for temporary traffic signals at bridge locations while crews upgrade bridge rail from Clarksville to Bogata.

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903)455-2303; Rains Co. Maintenance (903) 473-2682.

FM 2194, Hunt County: between Merit and FM 903. This project will widen the shoulders and apply safety treatments to fixed objects. The contractor is currently working on establishing vegetation. Please be careful when traveling in this area.

FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor is constructing cross culverts on this roadway. Roadway rehabilitation work has begun. Please be aware of lane closures, and watch for work zones and workers when traveling in this area.

SH 66 at FM 1570, Hunt County: This project is set to begin this week. The contractor will be placing SW3P devices and prepping the right-of-way. Please be aware of lane closures, and watch for work zones and workers when traveling in this area.

Maintenance crews in Hunt County will be performing overlay work on FM 36 at various locations. Maintenance crews will be placing a seal coat on FM 3427 in various locations. Contractor crews will be working on I-30 at various locations, from FM 1903 to Division Street in both east- and west-bound directions. They will be milling and inlaying hotmix asphalt materials and patching main lanes. Maintenance crews in Hunt County will also be performing ditch work, pothole repairs, mowing and metal beam guard fence repairs around the county, and removing debris from I-30 this week. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

Maintenance crews in Rains County will be performing patch work on FM 515, from FM 2795 to the Rains-Wood County line; and FM 514, from FM 275 to SH 19. Crews will be performing various sign installations, potholing and debris removal. Please watch for lane closures, work zones and workers along this portion of the roadway.

SH 34 bridge, Hunt County: 3.5 miles south of Quinlan. TxDOT has placed a temporary concrete traffic barrier to protect travelers from the damage caused by an 18-wheeler accident. The bridge/road is now open to both lanes of traffic. Please drive cautiously and safely in this area.

Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews. Debris and litter operations are ongoing throughout multiple parts of the county. Please be careful when traveling, and watch out for workers.

###

TXDOT Message
TXDOT Message

www.txdot.gov | TxDOT on Facebook | TxDOT on Twitter

Author: Matt Janson

Share This Post On