Paris — Here’s a look at work planned in the district for the week starting Oct. 24, 2022. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project.
The southbound lanes for SH 91 are closed at the US 75 underpass for crews to begin construction on the new overpass. Motorists traveling southbound on SH 91 will be detoured along the northbound US 75 frontage road to Taylor Street where they will make a left on Taylor Street and another left on the southbound frontage road. This closure is expected to last until Oct. 25, weather permitting.
The northbound and southbound US 75 frontage road intersections with Center Street have been converted to an all-way stop condition. Traffic on the frontage roads is asked to pay attention to the advanced warning signs and new stop signs, and approach the intersection prepared for a stop there.
Lamar Street and Houston Street under US 75 are closed to through traffic with detour signs in place to guide motorists around these intersections.
Eastbound Lamar Street traffic will turn right on the southbound US 75 frontage road, turn left on Center Street, and turn left on the northbound US 75 frontage road to return to eastbound Lamar Street. Video animation of this detour can be seen at the following link.
https://youtu.be/5LrCpdOA8OQ
Westbound Houston Street traffic will turn right on the northbound US 75 frontage road, turn left on Washington Street, and turn left on the southbound US 75 frontage road to return to westbound Houston Street. Video animation of this detour can be seen at the following link.
https://youtu.be/7jCatnI3Oq4
These switches will allow crews to reconstruct the proposed US 75 mainlanes and the bridge over Lamar and Houston Streets. The US 75 northbound frontage road traffic is reduced to one travel lane, but two travel lanes remain for northbound US 75 mainlane traffic. A concrete barrier separates the northbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
https://youtu.be/y_uO0UmpCzk
For southbound US 75 the frontage road traffic is reduced to one travel lane, but two travel lanes remain for southbound US 75 mainlane traffic. A concrete barrier separates the southbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
https://youtu.be/k2EG2W9rFJY
US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between South Loy Lake Road and Lamberth Street as crews work on building new exit and entrance ramps. Watch for shoulder closures and lane shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews work on building new exit and entrance ramps. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on construction of new frontage road lanes.
FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project. The West Cypress Grove Road intersection on the east side of FM 1417 is closed to through traffic to allow crews to work on paving at the intersection. During the closure, traffic wishing to use Cypress Grove Road is asked to use Mimosa Drive and Redbud Trail as a detour route. A traffic switch is planned for Oct. 31 where mainlane traffic will be switched to the new concrete section between Lamberth Street and SH 56. The Lamberth Street intersection on the west side of FM 1417 is scheduled to be closed to through traffic to allow crews to work on paving at the intersection on Oct. 26. During the closure, traffic wishing to use Lamberth Street is asked to use Taylor St. and Little Lane as a detour route. The Lamberth Street closure is expected to last three weeks.
South Travis Street, Grayson County: in Sherman at Post Oak Creek. Construction is underway for the South Travis Street bridge over Post Oak Creek. During construction, the bridge will be reduced to one lane with traffic signals controlling traffic through the project, while the new bridge is built in phases.
Business US 377B, Grayson County: in Whitesboro from Randy Street to Walnut Street. Watch for daytime lane closures as crews work to construct sidewalks and curb ramps. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
Business US 377B, Grayson County: south of Whitesboro at the railroad underpass near US 377. Watch for lane closures with signals controlling traffic while crews work to upgrade the bridge railing.
US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Friday morning during the overnight period. Lane closures will be present at night for crews to replace failed concrete sections. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.
FM 1753, Grayson County: from FM 120 to FM 1897. Watch for daytime lane closures as crews work to rehabilitate and overlay the roadway.
FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121. Construction is ongoing on this new-location roadway which is west of SH 289 approximately four miles. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections, with flaggers present to control traffic. Work on FM 121 at the FS 121 intersection (formerly Scharff Road intersection) is ongoing as crews work to widen the pavement to add turn lanes. Motorists on FM 121 should expect daytime lane closures while crews widen the pavement and install a culvert.
US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.
US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Sunday, Tuesday, and Thursday during the nighttime.
SH 56, Grayson County: from SH 289 to FM 901. Watch for daytime lane closures as maintenance crews perform spot milling on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 121, Grayson County: from US 377 to SH 289. Watch for daytime lane closures as maintenance crews perform base repairs and blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
SH 289, Grayson County: from FM 121 to the Collin County line. Watch for daytime lane closures as maintenance crews perform spot milling and blade leveling on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
SH 34, Fannin County: from FM 64 to FM 1550. Watch for occasional daytime lane closures as workers build the new SH 34 bridge over the future Lake Ralph Hall as well as the approaches to the bridge.
FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.
FM 1550, Fannin County: from County Road 3330 to SH 34. Watch for temporary one-lane closures as workers rehab and widen the roadway.
SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.
SH 78, Fannin County: from FM 896 to FM 981. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 981, Fannin County: from SH 78 to the Collin County line. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
SH 34, Fannin County: from FM 64 to FM 1550. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 2990, Fannin County: from FM 1550 to SH 34. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

Sulphur Springs Area (Hopkins, Franklin Counties):
Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.
FM 1536, Hopkins County: from SH 19 to FM 71. Watch for lane closures and short delays as crews rehabilitate the roadway.

Paris Area (Delta, Lamar, Red River Counties)
Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.
SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane closures while crews resurface the roadway.
US 271, Red River County: from SH 37 to Titus County Line. Watch for temporary lane closures while crews resurface the roadway.
FM 906, Lamar County: from FM 2648 to CR 47400. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.
FM 195, Red River County: from the Lamar County line to SH 37. Watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail.
FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.
Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures, perform bridge maintenance, and make crossover closures.
Loop 286, Lamar County: at the US 271 North overpass. Watch for road closures during overnight hours while crews perform bridge maintenance on the railroad bridge overpass. A signed detour route will direct traffic around this work site.
Loop 286, Lamar County: At Collegiate Drive intersection and the westbound FM 195 exit ramp. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures, perform bridge maintenance, and make crossover closures.
FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
CR 3440, Delta County: at Jennings Creek. Watch for road closure while crews replace the existing bridge.
CR 15100, Lamar County: at a Branch of Cuthand Creek. Be aware that the road is closed while crews replace the existing bridge.

Greenville Area (Hunt, Rains Counties)
Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

CR 1032, 1031 and 2132 bridge replacement project, Hunt County. The contractor has set barricades and advance warning signs. The contractor has reopened the CR 1032 bridge. The contractor has removed the existing CR 2132 bridge. The proposed drill shafts, abutments and west bridge deck have been constructed. The contractor is allowing cure time for concrete slab at this location. Please be aware of workers and watch for work zones when traveling in this area.
SH 224, Hunt County: The contractor has placed barricades and warning signs along with the detour route. The contractor will be forming and pouring abutments and caps this week. Grading for stone rip rap and building crane pads should be done shortly followed by rip rap and setting beams. Beams are scheduled to be set soon. Please be aware of this construction, detour route and workers in the area.
FM 275, Rains County: from SH 19 to FM 514. The contractor worked on laying profile tracks and RPMs and placing the final SETs on the driveway culverts. The contractor performed hand work on the SH 19 intersection. The contractor is cleaning up the area and working on final punch-list items. Please be aware of workers and watch for work zones when traveling in this area.
SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor is working on the west and east tie-ins and the widening of SH 34. The contractor is finishing up drainage and inlet placement for the project. The contractor is working on SH 276 and SH 34 concrete paving to complete the tie-ins. Work has begun on the project sidewalks and signals. Please be aware of lane closures and watch for work zones and workers when traveling in this area.
FM 38 & I-30 Bridges: The contractor plans to place block sodding on Oct. 21 at the FM 38 location, with striping and RPMs scheduled for next Oct. 26. Overhead bridge repairs on I-30 east bound have begun. The contractor has been removing and cleaning debris out the east and west side of Sabine Creek. Please be aware of lane closures and watch for work zones and workers when traveling in this area.
Maintenance crews for both Hunt and Rains County will be performing various overlay and potholing operations. Hunt County maintenance crews will be performing base repair and overlay on FM 1563 near Wolfe City and SH 11 in Commerce, and addressing culvert erosion on SH 24 near Commerce. Rains County crews will be working on FM 1565 and overlayed the intersection of FM 35 and FM 1565. Crews will be installing mailboxes, delineators, and signs in various locations. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

#