Alliance Bank in Sulphur Springs

Paris District Road Report for April 25, 2022

Paris — Here’s a look at work planned in the district for the week starting April 25, 2022. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. The northbound Washington Street exit ramp is currently closed and exiting traffic is requested to use the Houston/Lamar Street exit ramp. The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Lamar/Houston Street exit. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project. 

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road near West Staples Street and transitions back to the existing mainlanes near West Cherry Street. This operation will allow for reconstruction of the proposed US 75 mainlanes and the bridge over Center Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Center Street under US 75 are closed to traffic. To detour, eastbound Center Street traffic will turn right on the southbound US 75 frontage road, turn left on Park Avenue, and turn left on the northbound US 75 frontage road to return to Center Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on Houston Street, and turn left on the southbound US 75 frontage road to return to Center Street.

Beginning the night of April 27, weather permitting, crews will work on reopening the Center Street area to traffic. Northbound mainlane traffic will be moved to the newly constructed mainlanes the night of April 27, with lane closures beginning at 7:30 pm. The following week on May 4, southbound mainlanes will be moved to the newly constructed mainlanes. The Center Street intersection under US 75 is scheduled to be reopen to traffic the week of May 11. 

Northbound and Southbound US 75 mainlane traffic has been shifted onto the existing frontage road from just north of Houston Street and transitions back to the existing main lanes south of North Travis Street. This operation will allow for reconstruction of the proposed US 75 main lanes and the bridge over Washington Street. Within this area, the US 75 frontage road traffic has been reduced to a single travel lane, while US 75 mainlane traffic still maintains two travel lanes. Both mainlane and frontage road traffic are separated by concrete barriers. 

All eastbound and westbound lanes of Washington Street under US 75 are closed to traffic. This closure is necessary to complete work in preparation of the mainlane detour. To detour, eastbound Washington Street traffic will turn right on the southbound US 75 frontage road, turn left on Lamar Street, and turn left on the northbound US 75 frontage road to return to Washington Street. Westbound traffic will turn right on the northbound US 75 frontage road, turn left on North Travis Street, and turn left on the southbound US 75 frontage road to return to Washington Street.

Video animations of the northbound US 75 mainlane traffic switch and Washington Street detour can be viewed online at:

  • Northbound US 75 mainlane traffic switch:
  • Southbound US 75 mainlane traffic switch:
  • Detour for the Washington Street closure at US 75:

US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between North Loy Lake Road and Lamberth Street as crews work on building new exit and entrance ramps. Watch for shoulder closures and lanes shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews work on building new exit and entrance ramps. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on construction of new frontage road lanes.

FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project. The Skyline Drive intersection with FM 1417 is closed to traffic for about a week to allow crews to complete the concrete paving at this intersection. Traffic is asked to use Lamberth or Taylor Street during this closure.

SH 5, Grayson County: in Van Alstyne along Newport Drive from Partin Elementary School to SH 5, and along SH 5 from Newport Drive to Forrest Moore Park. Construction on a new multi-use trail is underway. The project will install an eight-foot-wide minimum sidewalk trail along this stretch of roadway. During work on this project, occasional lane closures will be required to complete the work.  

FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for occasional daytime lane closures as crews work to complete the remaining work on the project.  

US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Thursday night. Lane closures will be present at night for crews to replace failed concrete. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.

FM 1753, Grayson County: from FM 120 to FM 1897. Watch for daytime lane closures as crews work to rehabilitate and then overlay the roadway.

FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121.  Construction is ongoing on this new-location roadway which is west of SH 289 approximately four miles. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections with flaggers present to control traffic.

FM 121, Grayson County: in Van Alstyne from Preston Avenue to John Douglas Road. Watch for occasional daytime lane closures and shoulder closures as construction crews work to install sidewalks, curb ramps, and landscape features.

US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.

US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Sunday and Wednesday during the nighttime.

The annual contract to perform bridge repairs in Grayson County is underway. The following locations will have bridge repairs performed, so travelers should expect occasional lane closures while this work is underway. US 75 northbound mainlane bridge at Iron Ore Creek, US 75 southbound frontage road bridge at Iron Ore Creek, the SH 289 bridge approximately 1.75 miles south of FM 120, and FM 1417 at Post Oak Creek.

FM 1897, Grayson County, from US 69 to FM 1753. Watch for daytime lane closures as maintenance crews blade level the roadway.

FM 902, Grayson County, from SH 5 to SH 11. Watch for daytime lane closures as maintenance crews repair edge drop-offs along the roadway.

FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for occasional daytime lane closures as workers complete the remaining work on the project.

CR 3810 at Loring Creek, Fannin County. The bridge on CR 3810 at Loring Creek is closed to through traffic in order to replace the bridge. During this closure traffic is asked to use CR 3800.

SH 34, Fannin County: from FM 64 to FM 1550. Watch for occasional daytime lane closures as workers build the new SH 34 bridge over the future Lake Ralph Hall.

FM 1552, Fannin County: from SH 78 to County Road 3710. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.

FM 1550, Fannin County: from County Road 3330 to SH 34. Watch for temporary one-lane closures as workers rehab and widen the roadway.

SH 121, Fannin County: from the Collin County line to SH 56. Watch for temporary daytime lane closures and shoulder closures as workers install sloped end treatments on pipes and install guardrail.

US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow-moving construction equipment as crews work on re-establishing vegetation on the project. Watch for occasional daytime lane closures as crews complete the remaining work.

FM 1396, Fannin County: from FM 2029 west to CR 2275. Watch for daytime lane closures as crews work to widen the roadway.

US 82, Fannin County: from the Grayson County line to SH 121. Watch for daytime lane closures as crews work on profile milling the roadway and paving the roadway.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 37, Franklin County: from the elementary school to US 67. Watch for lane closures and short traffic delays as crews install sidewalk.

IH 30, Hopkins County: from Loop 301 to Franklin County Line. Watch for lane closures and traffic delays as crews begin surfacing operations.

FM 1536, Hopkins County: from SH 19 to FM 71. Watch for lanes closures and short delays as crews begin performing upgrades to cross drainage structures.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane closures while crews resurface the roadway.

US 271, Red River County: from SH 37 to Titus County Line. Watch for temporary lane closures while crews resurface the roadway. 

FM 906, Lamar County: from FM 2648 to CR 47400. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.

FM 195, Red River County: from the Lamar County line to SH 37. Watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail. 

FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

US 82, Red River County: from FM 1159 to the Bowie County line. Watch for work zones and drive safely through construction areas while final work is being performed.

Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures.

FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

Sidewalk and Curb Ramp Project (several counties): The contractor has set barricades at the Wolfe City, Texas, location. The contractor is currently working on Santa Fe street and is nearing completion in this area. The project is moving towards the downtown area of Wolfe City. The contractor has been working on forming and pouring concrete on sidewalks and driveways weather permitting. This project will improve pedestrian sidewalks and construct ADA-compliant curb ramps at these locations: Hunt County, SH 34 at Crockett Street to SH 34 at FM 816 in Wolfe City. Please be aware of workers and watch for work zones when traveling in this area.

FM 903, Hunt County: From US 380 to FM 1569 South. The contractor has set barricades and bulletin boards and advance warning signs. The contractor is working in the ditches and finishing base for the prime coat and will perform ride test soon. Prime coat will be scheduled. The contractor will also be reworking base and flex base haul on mile two. The contractor will be pouring three cross culvert extensions and wingwalls, and working on driveway pipe and safety end treatments.

FM 275, Rains County: from SH 19 to FM 514. The contractor has completed widening and reworking existing base for the last section of the project. New flex base hauling and placing has begun. Drill shaft installation has been completed and beams will be set soon. The contractor has completed the 150-foot bridge deck pour, as well as setting safety end treatments and driveway pipe on the north and south side of the project. The contractor continued embankment and grading ditches that were prime coated. Crews also performed prime coat patching, sweeping, repairing items and reinstalling silt fence removed for grading ditches. Please be aware of lane closures, detours, and watch for work zones and workers when traveling in this area.

SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor has placed project barricades and has prepared and cleared the right-of-way. The contractor has performed a traffic switch for northbound and southbound traffic on Spur 264 to complete the concrete pavement on the east half of Spur 264. The contractor continues grading flexbase on SH 276 from east of the bridge approach to the proposed CRCP section, fine grade embankment work on the west end of the project, and prep work for geo-grid and flexbase. Please be aware of lane closures and watch for work zones and workers when traveling in this area.

FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor has placed prime coat on the beginning mile. Prep work for temporary strip should be placed late next week for the first mile section. Contractor is working on mailbox turnouts, backfilling shoulders, seeding, and repairing silt fences along the left and right sides of miles one and two.

Maintenance crews in Hunt County will be performing base repair operations on FM 2358 and overlay operations on FM2194 from FM 903 to FM 36. Crews will be performing potholing at various locations in Hunt County. Maintenance contract crews will be performing debris removal on I-30 and guard rail repair at various locations around Hunt County. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.

Maintenance crews in Rains County will be performing seal coat prep work on FM 36 from SH276 to I-30 frontage road. Crews will be performing various sign installations, potholing, edging, and debris removal. Maintenance crews will be performing herbicide operations on various roadways. Please watch for lane closures, work zones and workers along the roadway, and maintain a safe distance from work crews.

###

new TXDOT EndTheStreakTX logo
new TXDOT EndTheStreakTX logo

www.txdot.gov | TxDOT on Facebook | TxDOT on Twitter

Author: Matt Janson

Share This Post On