TxDOT Begins Improvements to State Highway 154; Traffic Study at I-30/State Highway 19

TxDOT work planned in Franklin and Hopkins Counties during the week of Feb. 18, 2019 include:

Sulphur Springs Area (Hopkins, Franklin Counties):

SH 154, Hopkins County: From SH 11 to Loop 301. Watch for survey crews as they begin marking locations for upcoming roadway surfacing operations.

SH 19, Hopkins County: At Interstate Highway 30. Watch for workers placing counters for an upcoming traffic study at this location.

SH 37, Franklin County: From Mt. Vernon to Winnsboro. Watch for lane closures and short traffic delays as crews perform surfacing operations; flaggers will direct traffic.

These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

TxDot logo

Author: Staff Reporter

Share This Post On