Paris District Road Report for Week of September 30, 2024

Paris — Here’s a look at work planned in the district for the week starting Sept. 30, 2024. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Safety Message: Impaired driving and penalties – DUI & DWI

Driving while under the influence of alcohol or drugs can risk your life and the lives of others, and it can send you to jail. If you are under 21, it is illegal for you to drive with any detectable amount of alcohol in your system.

When am I legally intoxicated?

You are legally intoxicated in Texas when your blood alcohol concentration reaches 0.08 percent, but you are breaking the law as soon as drugs or alcohol affect your driving — or flying or boating — ability.

What are the penalties for a DWI?

First offense

  • Up to a $2,000 fine.
  • Up to 180 days in jail upon conviction with three mandatory days.
  • Loss of driver license up to a year.

Second offense

  • Up to a $4,000 fine.
  • One month to a year in jail upon conviction.
  • Loss of driver license up to two years.

Third offense

  • A $10,000 fine.
  • Two to 10 years in prison.
  • Loss of driver license up to two years.

These fines do not include a state fine of $3,000, $4,500, or $6,000 assessed upon sentencing.

Impaired driving with a child passenger

  • You will be charged with child endangerment if you’re driving impaired with children under 15.
  • You will be additionally fined up to $10,000.
  • You could be put in jail for up to two years.
  • You will lose your driver’s license for another 180 days.

Driving with an open container

Carrying an open container of alcohol in your vehicle, even if you’re not impaired, is illegal. Learn more about Texas open container laws.

Sherman Area (Fannin, Grayson Counties)

Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.

Grayson County:

US 75, from US 82 to North Loy Lake Road. This project will rebuild and widen the US 75 mainlanes from four lanes to six lanes as well as reconstruct the entrance and exit ramps on US 75. The project will also reconstruct bridges at FM 691, Iron Ore Creek and Spur 503, and add U-turn bridges at Loy Lake Road in Sherman and Spur 503 in Denison. A reduced speed limit of 65 mph on the US 75 mainlanes has been set for this construction project. Watch for shoulder closures and lane shifts on the mainlanes of US 75 as well as frontage road lane closures within the project.

The U-turn lanes for the US 75 frontage roads at FM 691 are closed to traffic to allow crews to work on constructing the middle portion of the new US 75 bridge over FM 691. During this closure traffic wishing to make a U-turn at the intersection is asked to turn left onto FM 691 and make another left at the next signal light.

The exit ramp from northbound US 75 to North Loy Lake Road in Denison is closed permanently. Travelers who wish to access North Loy Lake Road from northbound US 75 will detour up to Crawford Street, make a U-turn at the Crawford Street intersection, and head south on the frontage road to reach North Loy Lake Road. 

The entrance ramp on the southbound frontage road onto US 75, north of Spur 503 and south of Loy Lake Road, is permanently closed. This closure is part of the reconstruction of US 75 from US 82 to Loy Lake Road in Denison. Motorists who wish to travel south on US 75 from its intersection with Loy Lake Road are advised to note this change. A detour is in place requiring traffic to continue on the southbound frontage road, around Spur 503, to the entrance ramp for US 75 southbound located north of the FM 691 intersection. Signs will alert travelers and guide them along this detour route.

The northbound US 75 frontage road is closed to thru traffic north of FM 691 in order to replace the frontage road bridge over Iron Ore Creek. Work for the construction of the new US 75 northbound frontage road Iron Ore Creek bridge and northbound frontage road pavement is currently in progress. Motorists traveling along the northbound frontage road will take the northbound entrance ramp north of FM 691 and take exit 66 to access eastbound Spur 503. Local traffic wishing to return to FM 691 is asked to use Pool Road.

The westbound Spur 503 ramp to northbound US 75 is closed to traffic. A temporary detour is in place to divert this traffic onto the frontage road. Traffic will exit Spur 503 onto the frontage road using the new detour, continue along the Spur 503 frontage road which runs into the US 75 frontage road to the Loy Lake Road intersection. Traffic can continue along the frontage road through Loy Lake Road and then take the next entrance ramp to northbound US 75.

US 75, from FM 1417 to SH 91 (Texoma Parkway). A reduced speed limit of 60 mph on the US 75 mainlanes has been set on the mainlanes for this construction project. Watch for shoulder closures and occasional nighttime lane closures on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on completing the remaining work on this project. Watch for lane closures on the frontage roads between FM 1417 and SH 91. 

As the US 75 project continues to move into the final stages there will be nightly lane closures on both north- and southbound lanes as construction crews perform pavement marking and sign installation. Drivers should expect delays.

US 75, at the US 82 intersection. Watch for occasional daytime lane closures for the frontage roads on the northbound and southbound US 75 frontage road lanes between South Loy Lake Road and Lamberth Street, as well as on the eastbound and westbound US 82 frontage road lanes between FM 131 and Loy Lake Road while crews work on completing the remaining work at the intersection.  

SH 5, in Van Alstyne from Williams Way to Blassingame Avenue.  Watch for daytime lane closures on SH 5 as crews work to install a shared use bicycle and pedestrian trail.  The trail will follow along SH 5 from the existing trail at Williams Way to Blassingame Avenue, then along Tolson Avenue, then along Main Street where it will connect with Van Alstyne Parkway.  Motorists should expect delays during the daytime work hours as flaggers direct traffic through the work zone.

US 82, from SH 91 to the Fannin County Line. Watch for daytime lane closures on the US 82 eastbound and westbound main lanes as crews work to perform pavement repairs, milling, and an overlay on the surface. Motorists should expect delays during the daytime work hours when lane closures are present.

US 377, from US 82 to the Oklahoma State line. Watch for daytime lane closures on US 377 as crews work to perform pavement repairs, milling, and an overlay on the surface. Motorists should expect delays during the daytime work hours as pilot cars and flaggers direct traffic through the work zone.

US 82, from the Cooke County line to FM 901. Watch for daytime lane closures on the US 82 eastbound and westbound main lanes as crews work to backfill the overlay and place striping and rumble strips on the surface. Motorists should expect delays during the daytime work hours when lane closures are present.

FM 1417, from US 82 to SH 56. Travelers are advised that intermittent temporary daily lane closures will be required for both northbound and southbound FM 1417 while the contractor completes the remaining work. 

FM 121, from Main Street in Van Alstyne to SH 160. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway to an overall width of 26 feet. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

US 82, from the Cooke County line to FM 131 in Sherman. Watch for lane closures as workers replace the bridge railing and guardrail approaches at each bridge structure and install median barrier. During construction, bridge travel will be reduced to one lane while crews replace the bridge railing. Currently, the contractor is working on the eastbound and westbound US 82 lanes at Elba Creek, and the eastbound and westbound US 82 lanes at Deaver Creek. 

US 75 full depth concrete repair, from the Collin County line to the Oklahoma State line. Crews will be working on US 75 each week from Sunday night through Friday morning during the overnight period. Lane closures will be present at night for crews to replace failed concrete sections. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line. 

US 75 debris pickup, from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Sunday, Tuesday, and Thursday during the nighttime.

FM 901, from US 377 to US 82. Watch for daytime lane closures as maintenance crews blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

FM 901, from SH 56 to FM 902. Watch for daytime lane closures as maintenance crews place a fog seal on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

FM 3133, from SH 5 to the Collin County Line. Watch for daytime lane closures as maintenance crews place a fog seal on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

FM 2729, from FM 121 to FM 922. Watch for daytime lane closures as maintenance crews place a fog seal on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

Fannin County:

FM 2645, from FM 898 to FM 1753. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway to an overall width of 26 feet. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

FM 274, from SH 78 to FM 1753. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway to an overall width of 26 feet. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

SH 121 overpass at US 69. The SH 121 overpass at US 69 is closed to thru traffic while crews perform bridge repairs. All traffic will be required to take the exit for US 69 and then will be able to take the next entrance ramp back onto SH 121.  A temporary signal is in place to control traffic on SH 121 and US 69 during this closure.  Motorists should expect delays as signals control traffic through the construction zone.

CR 4020 at Caney Creek. CR 4020 at Caney Creek is closed to through traffic to allow for replacement of the bridge. During the closure traffic is asked to use CR 4025 as a detour.

FM 68, from SH 78 to FM 271. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway to an overall width of 28 feet. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

SH 78, from US 82 to the Oklahoma State line. Watch for daytime shoulder closures and occasional daytime lane closures as workers install sloped-end treatments on drainage structures and replace bridge rail and guardrail.

FM 100, from SH 56 to FM 2216. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

FM 271, from SH 78 to FM 68. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway. Motorists should expect delays as signals and pilot cars direct traffic through the work zone. 

SH 121, from SH 11 to US 69. Watch for daytime lane closures as maintenance crews perform bridge repairs. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

FM 151, from SH 11 to US 69. Watch for daytime lane closures as maintenance crews perform culvert repairs. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.

Sulphur Springs Area (Hopkins, Franklin Counties):

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

Franklin County: IH 30, Truck Parking Area. Crews will be constructing concrete paving on the new eastbound truck parking area.

Hopkins County: SH 19, from I-30 to Rains County Line. Watch for crews performing road rehabilitation operations and traffic shifts in the work areas.

Hopkins County: I-30, at FM 269. Crews will be performing tree trimming and tree removal operations on the westbound and eastbound side.

Paris Area (Delta, Lamar, Red River Counties)

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

Lamar County: 

Loop 286, from FM 1497 around the north loop to FM 1507. Watch for temporary lane and shoulder closures and traffic merges while crews improve guardrail and drainage structures and perform bridge maintenance.

US 271, from LP 286 to Oklahoma State Line. Watch for temporary lane and shoulder closures and traffic merges while crews resurface the pavement and perform bridge maintenance.

CR 26320 at Morrison Creek. Watch for temporary roadway closure and detour while crews replace existing bridge structure.

FM 1497, from FM 1184 to FM 3426. Watch for temporary lane and shoulder closures while crews rehabilitate the existing pavement and improve drainage structures

CR 16300 at Little Sandy Creek. Watch for temporary roadway closure and detour while crews replace existing bridge structure.

US 82 / Lamar Avenue, from 33rd street to 42nd street in Paris. Watch for temporary lane and shoulder closures in the nighttime hours while crews improve signals, install a raised center median, and resurface the roadway.

FM 38 at West Fork of Sanders Creek. Watch for temporary roadway closure and detour while crews replace existing bridge structure.

SH 24, Lamar & Delta Counties: from the FM 64 intersection to 1,540 feet east of FM 198. Watch for temporary lane closures and lane shifts while crews resurface the roadway and perform bridge rail upgrades.

SH 19/24, Lamar & Delta Counties: from LP 286 intersection to SH 19 . Watch for temporary lane closures and lane shifts while crews resurface the roadway, perform bridge rail upgrades, and bridge maintenance.

US 271, Lamar & Red River Counties: from FM 196 North to SH 37. Watch for temporary shoulder closures and trucks entering and exiting the highway as crews remove tree and brush from within right of way.

US 82, Lamar & Red River Counties: from State Loop 286 in Paris to Bowie County Line in Red River County. Watch for temporary lane and shoulder closures while crews improve drainage structures.

Delta County: 

FM 2068 at East Fork of Jernigan Creek. Watch for temporary roadway closure and detour while crews replace existing bridge structure.

SH 24, at Doctor’s Creek. Watch for temporary shoulder closures and trucks entering and exiting the highway as crews perform bridge maintenance on the northbound structure.

Red River County: 

FM 2120, from FM 2573 to SH 37. Watch for temporary lane and shoulder closures while crews rehabilitate the existing pavement and improve drainage structures.

FM 1487, from FM 910 to FM 412. Watch for temporary lane and shoulder closures while crews rehabilitate the existing pavement and improve drainage structures.

Northeast Texas Trail, Clarksville, Texas. Watch for trucks and equipment entering and exiting streets and highways while crews construct the off-system trail. 

Northeast Texas Trail, from BU 82J to Annona East City Limits. Watch for trucks and equipment entering and exiting streets and highways while crews construct the off-system trail. 

BU 82 J at East Langford Creek. Watch for temporary roadway closure and detour while crews perform bridge maintenance operations.  

Greenville Area (Hunt, Rains Counties)

Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.

Hunt County: 

SH 11, from FM 2655 to SH 24. This project will add shoulders and replace drainage structures. The contractor has set barricades and is currently widening shoulders and performing ditch grading in the area. Culvert and Safety End treatments are being installed along the project and excavation and road widening is in progress. Shoulder embankment work will be ongoing. Please be aware of workers and watch for work zones when traveling in this area. 

SH 11, from Culver Street to Live Oak. Final punch list items are underway. Oncor has supplied power to the signal lights and the signals are in testing phase. Please be aware of workers and watch for work zones when traveling in this area. 

FM 1563, from SH 50 to SH 2655: This is a 2.7-mile rehabilitation project that will widen the existing roadway. The contractor has set work zone signs and barricades. The contractor has completed cross culverts and culvert extensions and will be placing riprap soon. The contractor has sealed and shouldered up the first mile of the project and has placed flex base and placing geogrid at various locations. Contractor is currently performing reclamation work and subgrade widening along with placing GEOGRID. Driveways are ongoing and are being completed by section of work. Please be aware of workers and watch for work zones when traveling in this area. 

FM 2642, from FM 35 to SH 66: The contractor has set work zone signs and barricades. The contractor currently has paving operations and sidewalk operations ongoing. The contractor is placing sidewalk and backfilling curb in the area. Site Grading work is ongoing. Paving operations are in progress in areas north of FM 35 Please be aware of workers and watch for work zones when traveling in this area. 

FM 2649, from I-30 to FM 1567. The contractor has set barricades and work zone traffic signs. Cross culvert work is complete. The contractor has completed placing GR4 seal course on the final section of roadway. The contractor is also backfilling turnouts, driveways and roadway edges. Roadway strip and permanent seeding will be placed today and through the weekend. Please be aware of workers and watch for work zones when traveling in this area. 

I-30 intersection improvements from Monte Stratton to FM 1903. The contractor has set barricades and advance warning signs. The contractor has begun excavation at FM 1903 (West side) and working on placing wire wall at FM 1903 (East side) and soil nail walls at FM 1903.The contractor is also placing embankment & Wire walls east of 1570.along with Form work for Bent #3 Cap at FM 1570.Pipe/Inlets work for drainage FM 1570 is ongoing.Please be aware of workers and watch for work zones when traveling in this area.

I-30 Improvements from CR2511 to FM 36: The contractor is currently grading and placing embankment between the frontage roads and mainlanes. Continuing grading EB between 1565 and FM36.The contractor will be placing hot mix for shoulder rehab at night and Milling at night along WB and EB for shoulder rehab. Grading at FM 1565 intersection and embanking along WBML 2511 area. Underpass at FM 1565 will be closed for a few weeks to install Culvert from north frontage to south frontage.

Hunt and Rains Counties Hunt County and Rains maintenance crews will be performing pothole repair work throughout Hunt and Rains County. 

Hunt County MNT will be performing sealcoat prep on FM 2874.

Rains County MNT will continue to address pavement issues SH 19 south and north.

###

new TXDOT EndTheStreakTX logo
new TXDOT EndTheStreakTX logo

www.txdot.gov | TxDOT on Facebook | TxDOT on Twitter

Author: Matt Janson

Share This Post On